dot handrail cost per foot

SDG 9.2 BDR Cost Estimating ProcessThis chapter describes a three-step process to estimate bridge costs based on Fdot historical bid data. The first step is to utilize the average unit material costs to develop an estimate based on the completed preliminary design. The second step is to adjust the total bridge cost for the unique site conditions by use of the site adjustment factors. The third and final step is to review the computed total bridge cost on a cost per square foot basis and compare this cost against the historical ...

contract cost data - State of California151270. SALVAGE METAL BRIDGE RAILING. 151272. SALVAGE METAL BEAM GUARD RAILING. 151274. SALVAGE CONCRETE BARRIER (TYPE K). 151286. SALVAGE SIGN STRUCTURE. 151296. SALVAGE GUARDRAIL. 151512 ...... CONTRACT ITEM cost DATA. ITEM I T E M D E S C R I P T I O N . UNIT DIST NO. QUANTITY AVERAGE PRICE AMOUNT. CODE. CODE OF. (TO 1/10. per UNIT (TO $1/100). PROJ. UNIT) (TO $1/10,000). 071325 TEMPORARY FENCE ...

420 1 traffic railing - (32" f shape) - Florida Department of ...ft. \. 0. 0. 4. 2. 0. -1 o f4 .d g n. NO. SHEET. NO. INDEX r d. 9. 6. 0 r h. DESCRIPTION: REVISION. LAST. FY 2012/2013. Fdot DESIGN STANDARDS. Shown, Rigid Pavement Approach Slab Similar, Typ.) Approach Slab (Flexible Pavement ... The cost of all constructed perpendicular to the roadway surface. If an adjoining railing is constructed plumb, transition the. SUperELEVATED BRIDGES : At the option of the Contractor the Traffic Railing on superelevated bridges may be.

Bridge Rail Guide 200 - State of New JerseyHeight: 27". cost per linear foot: $38. Test level: TL-2. Utilized in: Texas. Contact: Mark Bloschock. Texas dot Bridge Division. RA118. 125 E. 11th Street. Austin, TX 78701-2483. (512) 416-2178. W-Beam Bridge Rail. 1.7. Section 1 page 1 of 2 .... Bridge Railing. TL-4. Illinois. Illinois 2399 - Curb Mount. TL-4. Federal Lands. George Washington. Parkway Steel Bridge Rail. TL-2. Curb Mounted. Steel Tube Bridge. Rails. Location. Subsection. Test Level. METAL TUBE BRIDGE RAIL.

2016 Bridge Cost Data - ODOT FTP19 Jan 2017 ... National Bridge Inventory. Deck area unit cost does not include mobilization, traffic control, and costs unrelated to the main type of work. Total Area. cost per. Number. Square. Total Bid. Square of. Work Type. Feet. Amount. Feet ...... 00599. Concrete Slope Paving. Concrete Slope Paving. SQFT. 2. 180. 17.00. $. 23.22. $. 00759. Miscellaneous Portland Cement Concrete Structures. Concrete Stairs. CUYD. 4. 2. 6,383.00. $. 5,527.67. $. Metal handrail. FT. 4. 231. 67.00.

Costs for Pedestrian and Bicyclist Infrastructure Improvementscosts for. Pedestrian and. Bicyclist. Infrastructure. Improvements. A Resource for Researchers,. Engineers, Planners, and the. General Public. Authors: Max A. Bushell, Bryan W. Poole,. Charles V. Zegeer, Daniel A. Rodriguez. UNC Highway ...... cost Unit the unit to which the cost is linked (e.g. lump sum, each, per mile, per linear foot, per square yard, etc.) State Name the state name in postal code format. Information Source Citation the title of the information source, usually a ...

852 1 STEEL PEDESTRIAN/BICYCLE RAILINGDESCRIPTION: REVISION. LAST. 2013. Fdot DESIGN STANDARDS. NOTES. MEMBER. DESIGNATION. DIMENSION. OUTSIDE. THICKNESS. WALL. Top Rail. Top Rail Joint/Splice Sleeves. Intermediate & Bottom Rail. Int. & Bottom Rail Post Connection Sleeve. handrail Joint/Splice Sleeves. handrails. handrail Support Bar. 1" NPS (Sch. 40) ... Railing shall be paid for per linear foot (Item No. 515-2-abb). Payment will be plan quantity measured as. PAYMENT: accordance with the ...

SDG 9 BDR Bridge Cost Estimating GeneralThis chapter describes a three-step process to estimate bridge costs based on Fdot historical bid data. The first step is to utilize the average unit ... The third and final step is to review the computed total bridge cost on a cost per square foot basis and compare this cost against the historical cost range for similar structure types. This process should produce a .... Fdot supplied components. The cost is for the bridge proper and does not include approach work, surfacing, or guardrail.

861 1 BRIDGE PEDESTRIAN/BICYCLE RAILING (ALUMINUM)2. 0. 1. 3 b o o k. \. 0. 0. 8. 6. 1. -1 o f3 .d g n. NO. SHEET. NO. INDEX r d. 9. 6. 0 r h. DESCRIPTION: REVISION. LAST. 2013. Fdot DESIGN STANDARDS spaced between open joints) top of Concrete Curb (Equally. " V-Groove in both faces &. 2. 1. Open Joint. »¿Intermed. Curb. Concrete railing continuation or termination see Contract Plans for actual. Index No. 862 Railing shown,. Pedestrian/Bicycle Railing. 7'-3" (Max.) ~. Height Bicycle Railing. 5'-8" (Max.) ~ Special. »¿. »¿. 4. '-. 6.

851 1 BRIDGE PEDESTRIAN/BICYCLE RAILING (STEEL)ft. \. 0. 0. 8. 5. 1. -1 o f3 .d g n. NO. SHEET. NO. INDEX r d. 9. 6. 0 r h. DESCRIPTION: REVISION. LAST. FY 2012/2013. Fdot DESIGN STANDARDS spaced between open joints) top of Concrete Curb (Equally. " V-Groove in both faces &. 2. 1. Open Joint. »¿Intermed. Curb. Concrete railing continuation or termination see Contract Plans for actual. Index No. 852 Railing shown,. »¿. »¿. Bridge Deck Sidewalk. " 2. 1. 2. " 2. 1. 2 l e n g t h. B o l t. (centered). " Hole. 16. 1. 1. »¿" (Galv. S. .

Section 9080 - Concrete Steps, Handrails, and Safety Rail - Iowa DOTB. handrail: 1. Measurement: Measurement will be in linear feet for each type of handrail, measured along the top of the handrail from end of rail to end of rail. 2. Payment: Payment will be at the unit price per linear foot for each type of handrail. 3. Includes: Unit price includes, but is not limited to, posts, mounting hardware or concrete grout, and finishing (painted, galvanized, or powder coated). C. Safety Rail: 1. Measurement: Measurement will be in linear feet for safety rail, measured ...

862 1 ALUMINUM PEDESTRIAN/BICYCLE RAILING3D VIEW OF RAILING WITH TYPE 1 - PICKET INFILL PANEL. FOR TYPE 3, 4 & 5 RAILINGS. INTERMEDIATE RAIL SECTION. ALTERNATIVE BOTTOM & required to complete installation of the railing. base plates, anchor bolts, nuts, washers, resilient or neoprene pads and all incidental materials and labor the length along the center line of the top rail, and includes rails, posts, pickets, panels, rail splice assembly,. Railing shall be paid for per linear foot (Item No. 515-2-abb). Payment ...

Product Details

Product List