build a ground level floating deck on concrete slab

Low Deck Construction Close to Ground Level - InspectAPedia.com This article describes the construction of low and ground-level decks, including questions of deck support, how beams are used, and how to construct overlapping joist connections over beams on large decks. We explain the construction features of floating decks and we include warnings about short or shallow deck posts

Which is cheaper: a deck or a patio? | HowStuffWorks Decks built with either type of material will require the additional cost of concrete footings to stabilize the structure, which could add another $1 to $2 per square foot. Plus, the labor to install a deck will be nearly equal to the cost of materials. Patios are flat, ground-level structures that can be made of a variety of materials,..

Should I Build a Low Level Deck Over an Existing Concrete Slab or . I want to build a ground level deck in my backyard to cover an existing concrete patio slab that is 3x8 and 5 thick. . The dimensions you described makes building a floating deck very challenging. . If you choose to build a wood or composite deck you will need to remove the concrete slab patio with a jack hammer

Building A Floating Deck Over Concrete Slab | Hardscape | Pinterest . How to Build a Deck Over a Concrete Patio. Wood PatioPatio With PaversHow To Lay PaversPatio SlabsDiy DeckPatio DecksPatio RoofDiy Concrete SlabPavers Over Concrete. Fasten the deck boards to the sleepers on the concrete patio: HELL YES

How to Build a Concrete Pad - Lowe's When building a landing for deck stairs, typical codes require the pad to extend beyond the steps about 36 inches, behind the steps about 12 inches and on the sides of the steps about 6 inches. Always follow . When the concrete has lost its sheen, smooth over it with a float, then make a non-slip surface with a stiff broom

Is it cheaper to build a concrete outdoor patio or a low floating deck . we have an existing cocrete floored porch,need to raise it to door step level I believe the contractor is doing a wooden above the concrete. will let you know as we go along. . In answer to your question.cheaper to do a wood deck.the price of concrete is tremendous right now, and that would be a lot of ground to cover

How to Build a Deck: Post Holes and Framing - Lowe's To help prevent rotting, this deck will have wooden posts attached to concrete footers above ground. For either . Step 7. Set the cut side down in the hole and make sure the form is plumb and level. . Begin creating the floor frame by marking the floor joist spacing on all of the beams following your building codes. Typically..

How to Build a Deck Over a Concrete Patio | Family Handyman If an area is badly cracked and sinks noticeably year after year, any decking you put over it will also sink and develop a low spot. In most cases, settling concrete stops sinking eventually, so delay this project until it does. This project raises the level of your patio by 2-1/2 to 3-1/2 in. (depending on the thickness of your..

Deck over existing cement slab - Professional Deck Builder Forums I'm building a deck that will be 180'' x 180'' when it is finished. . It would make my life easier if I could because the dek-blocks plus the framing makes the decking the perfect height to do this. . If the integrity of the concrete slab is good and level, you can install some "click together" decking products

How to Build Floating Decks: Tutorial for Novices - The Spruce Sep 14, 2017 . Lay Concrete Deck Blocks to Support the Small Deck. Picture of . Easy to situate as needed on your site, cement deck blocks provide the foundation for floating decks, as shown in this picture. .. Along with a carpenter's level, a square (picture) is one of the tools you can't do without when building a deck

Tips and Ideas on How To Build a Floating Deck - The Home Depot Utilizing the concrete footings, we placed our pressure treated 2x6 lumber into the grooves to maintain their vertical position. Think real life Lincoln Logs. Tips and Ideas on How To Build a Floating Deck: Deck Block. As most yards are not 100 percent level, we used 4x4 pressure treated lumber, cut to size, to prop up the 2x6..

How to Build a Floating Deck - The Home Depot Step 3 Measure and mark footer posts. To figure out the height of your posts, add 2 ft. to the height you want your deck to be off the ground. This is assuming you have a level lot! Mark that height on your 4 x 4 posts. Our posts ended up being 38-in. high. Cutting wood to build a floating deck..

framing - What are the best practices for a low deck built half on . Oct 18, 2010 . If your existing slab is not underfooted with a frost wall, and has not heaved or cracked over the years, then most likely a simple 8 inch concrete block in the ground the same depth or slightly deeper than the slab will . I ended up with what was described above- a ground-level deck, mostly on the slab

DIY Steps for Building a Deck Over a Patio Slab: The Low Down on . Mar 28, 2007 . How to build a deck over an existing patio slab with low clearance. . the door to build a deck over his patio. Even if we removed the austere concrete slab, the patio door threshold was barely above grade. . Dig out any sod and dig down so the tops of the pier blocks are about level with the top of the slab

How to Build a Floating Deck | how-tos | DIY A floating deck adds a great elevated place to sit and enjoy a view of a yard. . Level the Area. Excavate the area for the floating deck, then using a laser level, move dirt until ground is level. . Set them and make sure they're level, using wet concrete mixed in a large wheelbarrow, adding or removing concrete as necessary

Building Floating Deck Over Ground And Concrete Slab - Building . I've seen some posts about using deck blocks for floating decks but I'm really stumped how to go over an existing slab and transition onto ground and keep the . The deck itself is simple it's just getting this foundation setup right, and level over the slab and ground that's really got me hesitant to tackle it

Product Details

Product List